Rest for your guests, peace of mind for you. Clicwall gives you a wall system for partition walls and wall lining that moves hotels forward in every way: fire safety, performance and speed combined in one smart solution.
Safety is key, especially in public or high-traffic areas. Clicwall is available in a fire-retardant version (B-s1,d0) and allows you to achieve fire resistance of EI30, EI60 or even EI120 (depending on the chosen wall build-up).
Daily heavy use? No problem. The wooden wall panels are up to 4× more impact resistant than plasterboard. And they are easy to clean. Perfect for hospitality environments.
Renovating without delays? Hotel Astoria relied on Clicwall for a complete makeover in just 6 months. The reason? Dry installation, pre-finished panels, ultrafast assembly.
Sleek walls deserve a sleek finish. Combine Clicwall with design-matching melamine, HPL and edgebanding for a consistent look from wall to bed & desk: easy for you, flawless for your guest.
Tucked away among dramatic peaks and endless sea views, the Lyngvær Resort brings a fresh take on luxury escapes in Norway’s Lofoten islands. Built by the Estonian company Timbeco, these modular lodges prove that premium materials and prefab construction are a perfect match.
For the total renovation of the Astoria hotel, the owners called in the help of architectural firm Project Vijf and mINT architecture. The beautiful art-deco hotel with its 65 rooms was completely restored to its former glory in just four months.
The interior was a challenge, since they wanted to continue the impressive grandeur of the outside to the inside, with attention to comfort and luxury in a contemporary jacket and with touches of the past, says Danny Hoorelbeke (Project Vijf).
In the corridors, partition walls have been placed with the Clicwall system in H265 V1A Dainty Oak café noir. This design has also been continued in the furnishing of the rooms. They combined the Dainty Oak design in the open cabinets with brass accents and black.